 The Chapel is carpeted, the Cultural Hall is done, and the parking lot is paved. The building truly is very beautiful.


                                                The Step are done on the Family History
                                                  and the Stone work almost complete.
                                                    The Front Door is in too











This is the hall way in the Stake Office Suite
                                                     looking North.

November 2012

The Ceiling in the Family History being fitted with the rounded corners.
 
Family History Painted almost ready for carpet. The wood laying on the racks are the chair rails for the Stake Offices

Friday, August 31, 2012


The Family History Library is not as far along inside but moving right along. This is a view of the library looking toward the door and back to the back.

Wood trim in the Chapel and the Bathroom tile.

The cabinets are being set. In the Kitchen and the Library.


We have a steeple and a clock.

Wednesday, August 1, 2012

 The Church is almost ready for painting. On the outside they are just beginning to lay the brick. This building is very beautiful and as you would expect it is going to be a wonderful building. It looks so much bigger on the inside now that it is all sheet rocked.








 Some Random Pictures of the Family History Center. As you can see the sheet rock has not been started yet but will start as soon as the brick work is finished. This is really going to be a beautiful building.



The Brick has been relayed on the Family History Library. It looks so beautiful. The Front (South) main door is not installed so the brick on the South Side is not finished. The new windows on in the Family History or the second floor are all in and they look very nice.

Friday, June 15, 2012


Some shots of the Stake Offices in the 1924 Building. The High Council Room and the Lobby area.







The interior of the Family History Library.
The 1924 building: The contractors had to remove the entire first layer of brick from the building. It seems the mortar was not good between the brick.


The interior framing is about done. They are not putting metal studs on the outer walls.


As you can see; the roof is on, the stone work has begun. Inside they are starting the sheet rock. The Primary room and Relief Society room are sheet rocked.

Saturday, May 19, 2012



We had Stake Conference on May 12 and 13. Elder D. Todd Christofferson from the Qurorum of the twelve and Elder Robert C. Gay of the Seventy were here. It was a great conference. We had almost a thousand people in attendance at the Sunday General Session.

This is a look at the front of the Chapel and then from the front of the Chapel to the Cultural Hall.